“‘Productivity Enhancement by Reducing Setup Time -SMED: Case Study in the Automobile Factory’” (2012) Global Journals of Research in Engineering, 12(A5), pp. 21–26. Available at: https://testing.engineeringresearch.org/index.php/GJRE/article/view/415 (Accessed: 6 June 2026).