“Reduction of Production Lead Time using Value Stream Mapping (VSM) Technique” (2017) Global Journals of Research in Engineering, 17(A1), pp. 1–7. Available at: https://testing.engineeringresearch.org/index.php/GJRE/article/view/1549 (Accessed: 6 June 2026).