A Survey of Generator Maintenance Scheduling Techniques
Keywords:
Maintenance, Scheduling, Mathematical Heuristics Techniques
Abstract
Many maintenance-scheduling methods have been proposed using conventional mathematical programming methods or heuristic techniques. Heuristic approaches provide the most primitive solution based on trial-and-error approaches. Mathematical optimization based techniques are completely distinct from classical programming and trial-and-error heuristic methods. These techniques have been proposed to solve small maintenance scheduling problems. In this paper we explain the difference between both methods in solving generator maintenance scheduling (GMS) problem.
Downloads
- Article PDF
- TEI XML Kaleidoscope (download in zip)* (Beta by AI)
- Lens* NISO JATS XML (Beta by AI)
- HTML Kaleidoscope* (Beta by AI)
- DBK XML Kaleidoscope (download in zip)* (Beta by AI)
- LaTeX pdf Kaleidoscope* (Beta by AI)
- EPUB Kaleidoscope* (Beta by AI)
- MD Kaleidoscope* (Beta by AI)
- FO Kaleidoscope* (Beta by AI)
- BIB Kaleidoscope* (Beta by AI)
- LaTeX Kaleidoscope* (Beta by AI)
How to Cite
Published
2012-01-15
Issue
Section
License
Copyright (c) 2012 Authors and Global Journals Private Limited

This work is licensed under a Creative Commons Attribution 4.0 International License.